Powisset Farm
Construction
Case Study
An 1,800 SF deep-energy retrofit, built for the Trustees of Reservations; which included installation of super insulated walls, roof, and floor assemblies in the existing barn structure. Additionally, Stack installed a photovoltaic array system that ultimately makes the establishment net positive in terms of energy use. In addition to the deep energy retrofit scope, Stack constructed a full new commercial kitchen and classroom, where the staff will be initiating a new “farm to fork” CSA program visitors can partake in.
Architecture: ZeroEnergyDesign Construction: Stack + Co.